Anyone else thinking Porsche will make a major refresh to the Taycan, in particular to the motor, battery, and range with the reported base specs of the Macan getting 603hp, 100kWh battery, and more range, at a cheaper price point?
On Porsche Car Finder, the 2020 Turbos and Turbo S are the most discounted from the MSRP compared to other trims. For example this Turbo is listed at $144,991 with a window of $170,70 with 4,810 miles, while this 4S at the same dealer is listed at $127,498 with a window of $134,830 with 5,683...
I'm in California and have a purchase order with a dealer out of state. I paid a deposit for the car. But because of the delays, I can no longer wait, and need another car, now. Has anyone successfully fought to get back their deposit? — I believe non-refundable deposits are illegal in CA so you...
Does the base Taycan have a double-wishbone suspension? Or is it only with the air suspension[1]?
[1] https://newsroom.porsche.com/en/products/taycan/chassis-18561.html
I ordered my car to have the model designation deleted. I'm having my car delivered to PECLA and I was wondering if I could have them add it back there and what would the cost be? Thanks!
So it looks like my 22 Taycan 4 CT will come with the 9.6 kW PMC. And I was thinking of keeping and using this charger at home for my 50 amp breaker that's set up with a NEMA 14-50. And for my daily use, I don't see a situation where I won't have access to a full service charger where I would...
I have a build that went into production but I'm thinking about picking up a different trim. Is it possible to transfer the purchase agreement to someone else?
Has anyone else's estimated start of production date, past, but TYD is still stuck on scheduled for production? I'm trying to figure out if my car's in production but TYD just hasn't updated or how long should I expect the start of production to be delayed.
I have a 4CT that went to an actual milestone date (5/11) for scheduled for production. I was wondering what are people seeing in how many days it currently takes from moving from scheduled for production to start of production. Thanks!
I was told that if I change my build, even prior to the lock-in date, it will push the build to the end of the production line. Is this true? Or is it because the dealer just doesn't want to redo the paper work?
I'm ordering the Cross Turismo with lockable cross-bars[1]. Can anyone give me a review on these? Also can someone post real-life pictures of them installed as well?
Thanks!