ElectricSoul
Well-Known Member
- Joined
- Mar 23, 2021
- Threads
- 25
- Messages
- 161
- Reaction score
- 144
- Location
- Switzerland
- Vehicles
- MY2021 Taycan 4 CT in Crayon
- Thread starter
- #1
Several threads on this forum have posts about vehicles that started production in July and that still haven't left Zuffenhausen 2 months later.
I'm hearing that some of these vehicles will be held until at least mid-October.
Anyone else in that situation? What have you been told about the missing pieces?
Does anyone how they are kept at the factory? Is the charge rate maintained at optimal levels to preserve the battery?
I'm hearing that some of these vehicles will be held until at least mid-October.
Anyone else in that situation? What have you been told about the missing pieces?
Does anyone how they are kept at the factory? Is the charge rate maintained at optimal levels to preserve the battery?
Sponsored