Sponsored

Driving UK to Italy

Scandinavian

Well-Known Member
First Name
Peter
Joined
Nov 3, 2019
Threads
52
Messages
3,904
Reaction score
3,549
Location
France
Vehicles
Taycan T, Aston Martin DB9, Porsche 996 C4 Cab, i4
Country flag
annoyingly, it is quite common for networks to sum up the total from a station with multiple cables (and indeed to count every plug even if they are not all available simultaneously eg Chademo { 2x CCS shows as “3”).
This is something that requires some regulatory intervention - it is as misleading as internet speeds, which at least in the UK had a huge push from regulators to stop over promising.

As far as I have seen, Ionity is the only network who state a promise that “up to 350kW” will never mean 2x”up to 175” - each cable gets the full power available.
I have seen some new French network, that advertises 2x160 kW and 2x 320 kW chargers on the site! But then there is some extra information which states max 500 kW per site! So there will be a lot of throttling when many cars charge!
Sponsored

 

RacingDuck

Well-Known Member
First Name
Bernhard
Joined
May 16, 2024
Threads
0
Messages
116
Reaction score
122
Location
Germany
Vehicles
Hyundai Ioniq 5, Honda Civic Type R
Country flag
Ionity is now also installing Alpitronic HYC400 chargers which are 2x200 kW, so even there all is not well. But at least they have 200 kW and not 150 or 75 like others.
Not sure if the HYC400 also supports giving you 400 kW until someone else plugs in at the same charger.
 

jonjon808

Well-Known Member
Joined
Jan 14, 2023
Threads
6
Messages
108
Reaction score
115
Location
UK
Vehicles
4S Cross Turismo
Country flag
I have seen some new French network, that advertises 2x160 kW and 2x 320 kW chargers on the site! But then there is some extra information which states max 500 kW per site! So there will be a lot of throttling when many cars charge!
Was that IECharge by chance? I tried to use one of their sites near Rouen last week. This one had 3 charging posts with one at 160KW and one at 320KW, but I got no more than 100KW, even with ideal conditions. Site was really poor too. Tiny side road, with no space to turn and very short cables. No signage and no other services at all (not even a rubbish bin, soo pretty gross environment).
Sponsored

 
 








Top