Scandinavian
Well-Known Member
- First Name
- Peter
- Joined
- Nov 3, 2019
- Threads
- 52
- Messages
- 3,904
- Reaction score
- 3,549
- Location
- France
- Vehicles
- Taycan T, Aston Martin DB9, Porsche 996 C4 Cab, i4
I have seen some new French network, that advertises 2x160 kW and 2x 320 kW chargers on the site! But then there is some extra information which states max 500 kW per site! So there will be a lot of throttling when many cars charge!annoyingly, it is quite common for networks to sum up the total from a station with multiple cables (and indeed to count every plug even if they are not all available simultaneously eg Chademo { 2x CCS shows as “3”).
This is something that requires some regulatory intervention - it is as misleading as internet speeds, which at least in the UK had a huge push from regulators to stop over promising.
As far as I have seen, Ionity is the only network who state a promise that “up to 350kW” will never mean 2x”up to 175” - each cable gets the full power available.
Sponsored