mangobay
Well-Known Member
- First Name
- Omar
- Joined
- Jan 18, 2021
- Threads
- 4
- Messages
- 169
- Reaction score
- 200
- Location
- UK
- Vehicles
- Taycan GTS ST 2023. Cayman GT4 (981); BMW X5 40i
- Thread starter
- #1
Hi all
Ive recently moved house and, as part of trying to port my Octopus Go tariff over, have realised that the smart meter installed in my new property is only a SMETS 1 first gen meter. As many of you may know, these are a bit of a disaster, and dont work to transmit half-hour data as they should as they generally stopped working when people switched away from the originally installing supplier.
It looks like I am stuck in a problem period of having to wait out for the meter to be upgraded, and Octo are saying there is no way of rushing this as the central authority (DCC) have control over when these get upgraded. Which means no off peak charging as there is no off peak!
Has anyone else encourntered this and found a way around it please?
thanks a lot
Ive recently moved house and, as part of trying to port my Octopus Go tariff over, have realised that the smart meter installed in my new property is only a SMETS 1 first gen meter. As many of you may know, these are a bit of a disaster, and dont work to transmit half-hour data as they should as they generally stopped working when people switched away from the originally installing supplier.
It looks like I am stuck in a problem period of having to wait out for the meter to be upgraded, and Octo are saying there is no way of rushing this as the central authority (DCC) have control over when these get upgraded. Which means no off peak charging as there is no off peak!
Has anyone else encourntered this and found a way around it please?
thanks a lot
Sponsored