charging pod

haifeng911

Member
First Name
haifeng
Joined
Apr 1, 2023
Threads
3
Messages
15
Reaction score
12
Location
Birmingham
Vehicles
taycan gts
Country flag
Hi all, about to take my taycan gts next week and thinking to get a charging pod installed at my work place, anyone who has experience of it and any company to recommend?i have spec:

22kW On-board AC charger
150kW on-board DC-DC converter
Sponsored

 

simcity

Well-Known Member
First Name
Sean
Joined
May 22, 2022
Threads
37
Messages
1,351
Reaction score
1,150
Location
Suffolk, UK
Vehicles
'23 Taycan Turbo
Country flag
I think realistically you're just looking at an AC chargepoint install, similar to a domestic install or is there something more specific or specialised required for your work install?
 

Browning

Well-Known Member
First Name
Gary
Joined
Jul 18, 2021
Threads
34
Messages
334
Reaction score
147
Location
UK
Vehicles
RangeRover D350 MHEV New Disco 300D MHEW Taycan4S
Country flag
Hi all, about to take my taycan gts next week and thinking to get a charging pod installed at my work place, anyone who has experience of it and any company to recommend?i have spec:

22kW On-board AC charger
150kW on-board DC-DC converter
We chose CTEK Chargestorm 3 phase chargers 22kw AC had three fitted and got to say really pleased with them not cheap but great bit of kit and would definitely recommend
 

Jasper4S

Well-Known Member
First Name
Jasper
Joined
Oct 5, 2022
Threads
13
Messages
401
Reaction score
673
Location
Netherlands
Vehicles
Taycan 4s ST
Country flag
How long will your car stand still at the office ? If you have a 9 to 5-ish day, an 11kw charger will be enough
 

simcity

Well-Known Member
First Name
Sean
Joined
May 22, 2022
Threads
37
Messages
1,351
Reaction score
1,150
Location
Suffolk, UK
Vehicles
'23 Taycan Turbo
Country flag
How long will your car stand still at the office ? If you have a 9 to 5-ish day, an 11kw charger will be enough
To be fair, as the OP has a 22kW OBC - if they had 3-phase available at work, for the (relatively minimal) cost difference between plumbing it up for single-phase connection vs three-phase connection - I'd just plump for a 32A three-phase capable charge point and be done with it.

At least then they'd leverage some time/cost benefit from the rather expensive 22kW OBC option.

What's not clear is if this charge point needs extra bells and whistle as it not in a domestic setting (i.e. single private use basically). Things like fob or RFID access, back-office billing charge-back etc. or indeed having a third party own and operate it, like a quasi public charge point.