WasserGKuehlt
Well-Known Member
- Joined
- Sep 7, 2022
- Threads
- 5
- Messages
- 1,696
- Reaction score
- 1,909
- Location
- WA
- Vehicles
- 4CT, 996C2, MacanS
PMC+ (the web application embedded in it) can show the last 3 charging stations, and current status. Of mild interest might be the temperature reading - of the unit itself, not that of the cable(s).There is no real user benefit connecting the PLC+ to the network for most users. So nothing to worry about.
Getting it to work on PLC is a right pain - by definition (in the US) the charger is on a separate circuit, and I found the level of interference to be extremely high. I posted somewhere else on the forum my experience, as well as the APIs it supports.
Sponsored