Crick

Well-Known Member
First Name
Crick
Joined
Jan 30, 2021
Threads
3
Messages
138
Reaction score
111
Location
Palo Alto, CA
Vehicles
2018 Volt, 2009 BMW X5D, 2021 Taycan Turbo S
Country flag
I placed my order in January 2021. The expected delivery is (now moved out to) mid-December 2021. Six months of that time was waiting for an allocation. I'd contacted every dealer in California with my build. Was first on the waiting list for a Turbo S allocation. There were a few dealers that called to offer to get me one of the few S models sitting on lots throughout the U.S. – but no one had an S allocation until June.

Porsche Taycan Huge demand for Taycan causing wait to stretch to 6 months 1631561362821


Porsche Taycan Huge demand for Taycan causing wait to stretch to 6 months 1631561330461
 
Last edited:

XLR82XS

Well-Known Member
First Name
LXA
Joined
Mar 31, 2021
Threads
9
Messages
1,983
Reaction score
1,370
Location
SW FL | Vegas
Vehicles
2021 Taycan | 2021 Cayenne GTS | 2018 991.2 | DMC

HRHTHEO

Well-Known Member
Joined
Jul 26, 2021
Threads
1
Messages
48
Reaction score
14
Location
Texas
Vehicles
Ordered- 2022 Taycan 4s
Country flag
My lock date was Sept 4th and shows delivery of Dec 3rd and my sales agent still claims that’s entirely probably…. ??‍♂
Same lock and delivery date. We shall see.
 

Jrkennedy37

Well-Known Member
First Name
James
Joined
Apr 12, 2021
Threads
6
Messages
347
Reaction score
288
Location
Dallas TX
Vehicles
'18 Panamera ST, '21 Taycan CT4
Country flag
Not my personal experience, FWIW
Thanks for details. Our CT4 started production 7/14, anticipated completion 10/15 and delivery scheduled for 12/10 according to TYD, FWIW.
 


jcroix

Well-Known Member
First Name
John
Joined
Jul 29, 2021
Threads
3
Messages
53
Reaction score
50
Location
Austin
Vehicles
2022 Porsche Taycan 4S
Country flag
I ordered my loaded 4S in May, with a July lock date. Production started 4 days early: on 9/13. Will supposedly be completed on 9/28. Expected delivery on 11/5, but will probably be at the dock in Houston for a week instead of the single day shown in the build/delivery schedule.
 

Climax_F82

Well-Known Member
Joined
Jul 5, 2021
Threads
8
Messages
125
Reaction score
144
Location
Los Angeles
Website
www.instagram.com
Vehicles
22 Taycan
Country flag
For MY22 Taycan models, the earliest delivery dates people have are in November? Just wondering when the first '22 deliveries will start..mine shifted from Nov to Dec and will probably shift again.
I’m also in Cali and ordered first week of July. ETA was originally mid November , now moved to early December .
 


farazkhu2

Well-Known Member
First Name
Fa Fa
Joined
Mar 29, 2021
Threads
2
Messages
102
Reaction score
58
Location
USA
Vehicles
BMW 750i, Taycan
Country flag
What I don't understand from this article is what they specifically mean by "sales". Are those cars delivered, or contracts sold and if so are these allocations meaning they have "sold" all their available production slots for this year? I assume the second alternative to be true.

I think they have sold all the allocations for this year, that is why they are giving 6months delivery time. My RWD was delayed about 3 weeks, which wasn't that bad. TYD was the best tool to track it until it got the Bencia port, then there was 3 week delay before they updated it.
 

GG77

Well-Known Member
Joined
Jun 22, 2021
Threads
4
Messages
171
Reaction score
127
Location
California
Vehicles
Taycan 4S, Cayenne S
Country flag
I’m also in Cali and ordered first week of July. ETA was originally mid November , now moved to early December .
I made a deposit on Aug 6th. Freeze date was Sep 6th and delivery date was Nov 26th but for no reason the freeze date and delivery date both changed in the third week of August. Now freeze date is today and delivery is Dec 10th. Hopefully doesn't jump any farther.
 

Climax_F82

Well-Known Member
Joined
Jul 5, 2021
Threads
8
Messages
125
Reaction score
144
Location
Los Angeles
Website
www.instagram.com
Vehicles
22 Taycan
Country flag
I made a deposit on Aug 6th. Freeze date was Sep 6th and delivery date was Nov 26th but for no reason the freeze date and delivery date both changed in the third week of August. Now freeze date is today and delivery is Dec 10th. Hopefully doesn't jump any farther.
Same ! I hit my change freeze point yesterday. I made a change 2 weeks ago 3 days before the freeze point so I thought that was the reason why it got pushed back a couple weeks.
 

f10tt

Well-Known Member
Joined
Aug 12, 2021
Threads
9
Messages
278
Reaction score
189
Location
NoVA
Vehicles
2022 Taycan, 2022 Cayenne, 2021 Bronco
Country flag
For MY22 Taycan models, the earliest delivery dates people have are in November? Just wondering when the first '22 deliveries will start..mine shifted from Nov to Dec and will probably shift again.
Yes. My SA said their dealership won't start even delivering 2022s until 11/01.
 

Greenmachine

Well-Known Member
First Name
Nick
Joined
May 14, 2021
Threads
5
Messages
106
Reaction score
225
Location
California
Vehicles
Taycan CT4 Range Rover, Tacoma
Country flag
If I believe TYD then my 2021 CT has just completed production. Be interesting to see how many more roll off the production line before they start making the 22s.
 

B61

Well-Known Member
First Name
Bine
Joined
May 31, 2021
Threads
7
Messages
2,377
Reaction score
1,553
Location
SI
Vehicles
CT4 (9/2021)
Country flag
Why is taking 3 months for Production?
IMO, it takes a week to make one…so, I guess those dates are not accurate.
Sponsored

 
 




Top