Anyone else from the US (I'm in LA) have a December 10 delivery date? Want to get a sense of how realistic that could be -- my date has already been pushed back two weeks from the end of November.
Putting aside initial SA claims that my July order would be ready in October and freeze date moving from September to October...my Dec 10 delivery date hasn't moved in at least 6 weeks. Fortunately, my dealer is about 10 miles from the east coast port (Davisville, RI), though TYD has it "en route" for a week.
Sponsored

 

frankchn

Well-Known Member
First Name
Frank
Joined
Jun 20, 2021
Threads
3
Messages
69
Reaction score
64
Location
Bay Area, CA
Vehicles
992 TTS, Taycan TTS
Country flag
2022 Turbo S sedan here.

Got an allocation 9/10, freeze point 9/14, scheduled 9/28. Expected production complete 10/15, delivery to Bay Area dealership 12/10.

I have a bunch of options on the car so fingers crossed it won’t get delayed because of missing chips.
Update on my car: According to TYD, vehicle just went into production today ("Start Production" or V260), 3 days ahead of schedule. Other dates are unchanged.
 
OP
OP
RPTRXV

RPTRXV

Well-Known Member
Joined
Jul 30, 2021
Threads
16
Messages
104
Reaction score
26
Location
Los Angeles
Vehicles
Audi Q7 / Taycan CT4 / Model X (ordered)
Country flag
Update on my car: According to TYD, vehicle just went into production today ("Start Production" or V260), 3 days ahead of schedule. Other dates are unchanged.
Thanks for the update, mine also went into production, 3 days later than anticipated. Here’s hoping
 

Taycan_SF

Member
Joined
Mar 10, 2021
Threads
3
Messages
23
Reaction score
16
Location
San Francisco Bay Area
Vehicles
Tesla
Country flag
It's interesting. My CT4 was put on the vessel today, but TYD is now showing delivery date to dealer on 12/3 a full one more month delay from yesterday. it does show the ship arriving at Benecia on 11/8 but they estimate 11/26 for the car to be processed at port...

I don't know if I'll see the car in December...
 

Bella

Well-Known Member
Joined
Jul 16, 2021
Threads
4
Messages
223
Reaction score
102
Location
Santa Barbara, Ca
Vehicles
2022 Taycan 4 CT, Prius
Country flag
It's interesting. My CT4 was put on the vessel today, but TYD is now showing delivery date to dealer on 12/3 a full one more month delay from yesterday. it does show the ship arriving at Benecia on 11/8 but they estimate 11/26 for the car to be processed at port...

I don't know if I'll see the car in December...
Good news is that the Car is shipped. The bad news is something is going on at the Port causing the Car to sit 18 days. Could be a combination of missing parts and or delays that are being reported at all the West Coast Ports. Is it a 2021 or 2022?
 


Taycan_SF

Member
Joined
Mar 10, 2021
Threads
3
Messages
23
Reaction score
16
Location
San Francisco Bay Area
Vehicles
Tesla
Country flag
you're right. so far no active recalls on vin.. its MY21 car. ordered in July with Sep build...

I also heard there are over 18 ships waiting to unload at Benecia... what a mess
 

VA_CT

Well-Known Member
Joined
Jun 30, 2021
Threads
3
Messages
154
Reaction score
126
Location
Bay Area, CA
Vehicles
2019 Macan, 2022 4CT
Country flag
Update on my car: According to TYD, vehicle just went into production today ("Start Production" or V260), 3 days ahead of schedule. Other dates are unchanged.
Same here..fingers crossed
 


MohCT4

Well-Known Member
Joined
Apr 23, 2021
Threads
2
Messages
134
Reaction score
104
Location
Chicago, IL
Vehicles
Taycan 4 Cross Turismo
Country flag
CT4, ordered in April for a June build originally 7/31 delivery, now showing 12/31. I’m in Chicago.
 

misterfring

Member
First Name
Brandon
Joined
Jul 10, 2021
Threads
5
Messages
22
Reaction score
8
Location
USA
Vehicles
Cayenne
Country flag
Chicago here.

Base. order deposit down in July with an October/early November anticipated delivery.

9/14 freeze; 10/5 production. Delivery moved from 11/26 to 12/3 after it moved into production.

Dealer reached out last week (before delivery changed to December in TYD) and noted he thinks it’ll be a week before that, but given this forum, not holding my breath.
 

gps217

Well-Known Member
Joined
Aug 31, 2021
Threads
6
Messages
59
Reaction score
42
Location
Florida
Vehicles
Taycan
Country flag
Order placed on 9/2 for a 2022 base Taycan, freeze date 9/24 then moved to 10/8, dealer inventory planned for 11/19 then moved to 12/3. Still have not received anything from Track My Dream.
 

frankchn

Well-Known Member
First Name
Frank
Joined
Jun 20, 2021
Threads
3
Messages
69
Reaction score
64
Location
Bay Area, CA
Vehicles
992 TTS, Taycan TTS
Country flag
Chicago here.

Base. order deposit down in July with an October/early November anticipated delivery.

9/14 freeze; 10/5 production. Delivery moved from 11/26 to 12/3 after it moved into production.

Dealer reached out last week (before delivery changed to December in TYD) and noted he thinks it’ll be a week before that, but given this forum, not holding my breath.
Looks like our cars are production line buddies. I assume you are on the East Coast though (my delivery date is a week later and the expectation from my dealer is that it will take a week or two later than the 12/10 projection for the car to be delivered).
 

frankchn

Well-Known Member
First Name
Frank
Joined
Jun 20, 2021
Threads
3
Messages
69
Reaction score
64
Location
Bay Area, CA
Vehicles
992 TTS, Taycan TTS
Country flag
Update on my car: According to TYD, vehicle just went into production today ("Start Production" or V260), 3 days ahead of schedule. Other dates are unchanged.
Another update. The delivery date to dealership slipped by a week to 12/17. This is probably more realistic -- the original dates had the ship docking in Benicia and the car being at the dealership on the same date.
 

EJM22

Active Member
Joined
Sep 24, 2021
Threads
0
Messages
36
Reaction score
23
Location
Houston
Vehicles
MY23 Taycan RWD
Country flag
Dealer 4S order placed: 7/22
TYD order date: 9/07
Freeze date: 9/29
Production completed: 10/29
Delivery date: 12/3, 12/10 (this has changed a few times)

I know once on the vessel port delivery is about 20 days on average. My dealer usually gets the vehicles the same or next day once at the port.

I’m in Houston. I made one change back in August pushed my date a week then it changed back. I got the premium, tech, and performance packages. I’m hoping chip allotment is improving.

2B9E3767-EC18-4AAE-8737-4BDFE39E7164.jpeg
24DF5CDE-09BE-4D4D-8778-B1F892AAC484.jpeg
0C0E5793-F4D1-4767-A50E-4B547BBD79CA.jpeg
8A4CFCE8-575A-4E1D-ACE4-6926E30056C6.jpeg
What dealer did you order from? I was looking at placing an order soon at Porsche North location and was told 3 months build time but looks like that’s not going to be case, which is kinda ok i may just order sooner than expected. Thanks.

Nice ride btw.
 

Climax_F82

Well-Known Member
Joined
Jul 5, 2021
Threads
8
Messages
125
Reaction score
144
Location
Los Angeles
Website
www.instagram.com
Vehicles
22 Taycan
Country flag
Mine just went into production today right on schedule. Fingers crossed that production will be done on the 15th like it says. We shall see....