Bella
Well-Known Member
- Joined
- Jul 16, 2021
- Threads
- 4
- Messages
- 223
- Reaction score
- 102
- Location
- Santa Barbara, Ca
- Vehicles
- 2022 Taycan 4 CT, Prius
For anyone on the Asteria Leader it just left the Port. Current ETA San Diego is 12/28. Interesting that with all the delays my Car left one week earlier than the original date I was given in July. However, after talking to the Dealer I will miss the year end cutoff by 2-3 days. To make the end of Dec to the Dealer only gives me 3 days to clear the Port. I once had a Porsche that made it in 3 days so I guess I have a slight chance.For those of you more experienced than me here is a question.
TYD says my car has been at Emden for a week. It’s says the next phase is on a vessel on Dec 17th(there is no Vessel on that date but I realize it’s just an estimate) and the name of the Vessel is Asteria Leader. TYD JUST UPDATED THE VESSEL NAME. That Ship is at the Port and leaves today. It would arrive on Dec 28th if on time. If this happens I could make year end as I’m close to the Port(4 hours). Is anyone else on this ship?
Sponsored