My car is finally on the way to Emden so thought it was time for an April delivery thread. Ice Grey Taycan 4S, Porsche Code: PNJ1AS20
10/25/2021 - Deposit placed and allocation received
12/22/2021 - Change Freeze point reached. There were several delays and earlier freeze points but this was the final one.
01/25/2022 - Production started
02/11/2022 - Production completed. One reason it likely took a bit longer was due to the application of the front PPF.
02/14/2022 - In transit to Emden
02/15/2022 - Arrived in Emden (Updated)
03/29/2022 - On Vessel (Updated)
04/26/2022 - Entering Channel (Updated)
04/26/2022 - Port of San Diego (Updated)
05/07/2022 - Delivery Tucson AZ
I'm assuming that the last three dates are bogus. TYD has had some flaky dates for the estimates but it seems to eventually catch up. I'm hoping it actually makes it onto a vessel on 02/25/2022 and, with a bit of luck, maybe it will arrive a bit early. ?
10/25/2021 - Deposit placed and allocation received
12/22/2021 - Change Freeze point reached. There were several delays and earlier freeze points but this was the final one.
01/25/2022 - Production started
02/11/2022 - Production completed. One reason it likely took a bit longer was due to the application of the front PPF.
02/14/2022 - In transit to Emden
02/15/2022 - Arrived in Emden (Updated)
03/29/2022 - On Vessel (Updated)
04/26/2022 - Entering Channel (Updated)
04/26/2022 - Port of San Diego (Updated)
05/07/2022 - Delivery Tucson AZ